The E280 is used both to create expansion joints on large roofs (over 50m2) and create rolls on any ridge details and is compatible with C5 closures.
An adequate gap in the deck should be cut if necessary, the trim should then be nailed to each end of the decking at 300mm centres. The join over the nails should then be bandaged and the laminate should be applied over the trim. To bond these trims together, or to cap with C5 closures, apply a thin strip of PU adhesive to the inside edge of the overlapping trim and rub it into place.