How long do I mix the catalyst for?
I have a small bay window that I want to use the GRP roofing system on and want to know how long should I mix the catalyst in the resin and topcoat before I apply and how can I tell if it's been mixed correctly?
Once you've measured out the correct amount of GRP roofing base resin or finishing topcoat into your mixing bucket, add the desired amount of catalyst using the special measuring bottle or syringe and then you'll need to give it a good mix for at least 2-3 minutes making sure to get in all the corners.
The Fibrelast system has a special colour change indicator which will turn the resin from a blue to a deep green to indicate the mixing is complete and you're ready to apply.
Related questions
Here are some more questions you may find helpful.
How long does it take for Fibrecoat to become watertight?
How long does it take for Fibrecoat to become watertight? I live at the top end of Scotland and want a system that I can get down quickly to avoid any sudden downpours.
Will Fibrecoat bond to GRP Roofing trims
I have a roof that needs covering and was originally going to use a standard GRP system but having seen Fibrecoat I would like to use this. My question is will Fibrecoat bond to the GRP roofing trims?
Can I use Fibrecoat without the Glassfibre?
I have a project to do that involves coating a concrete roof which is around 50 square metres and in good condition. I want to know if I can use the Fibrecoat system without the fibreglass as I don't need the reinforcement.
Does the PU Activator make the surface waterproof?
Just looking through your website on Fibrecoat and want to know if I applied the PU activator, would it make the surface waterproof or would I have to apply the Fibrecoat resin system?