Description
Used to simulate the appearance of raised rolled lead joints and provide additional expansion the E35-40 rolled joint should be nailed to the deck at 30 cm centres. The joins and nail penetrations should be bandaged before the main GRP roofing base system is laid over the top of the trim. Ensure that the laminate is well consolidated over the top of the trim.
Additional information
Weight | 5 kg |
---|---|
Length | 3 metres |
Girth | 130mm |
Flanges | 20mm |
Height | 40mm |
Roll width | 35mm |
What others are saying
There are no contributions yet.